Activity Codes or WBS: Which is Better?

I have a confession to make. In my latest book, CPM Mechanics (2012), I was especially critical of the Work Breakdown Structure concept.┬áIn fact, I was equally harsh in my first book, Faster Construction Projects with CPM Scheduling (2007). I even wrote a separate┬áICS-White Paper in January 2012, entitled, “How WBS Can Break a Schedule.” The truth is that the… (more…)